A.Barber and myself descended upon the Foley Room in Ellerslie this week, prepped for 5 days for World War 1 Feet Foley!
Mud, gravel, grass, fields, snow, concrete (dry & wet), wooden shacks, hospital floors, wooden walking planks, building debris and steel ship decks were some of the surfaces we had to cover.
It was an epic and very creative week, and such a rewarding experience.
Many thanks to A.Barber for her awesome recording skills, encouragement and long hours during an already busy week. Can't wait to hear the final mix!!
|
Rugs pulled back for maximum surface space |
|
Grass, dirt, mudpit, snow and rickety wooden floor boards |
|
Maximum coverage! |
|
A sheet of Steel dropped off by Bruce for ship deck feet |
|
Rubble!! |
|
Mud feet in the pit |
|
Mud scrapes, slides and scrambling |